Special convoy (19 trucks) and trailors                      Internal view of one deluge valve container for
                                                                       Russia


                                                                          approved vendors of the suppliers of instruments
                                                                          that had to be installed with packages
                                                                       •   identification and choice of special construction
                                                                          materials and alloys that can withstand extreme
                                                                          cold or extreme warm environments, suitable for
                                                                          enclosures/containers (cooling systems for hot
                                                                          environment and heating systems for very low
                                                                          temperatures)
                                                                       •   special welding processes done by qualified
                                                                          welders and with special tests such as penetrant
                             CO  systems for Russia (more than 1400 cylinders)  liquids, X-rays, even in presence of external
                                2
                                                                          inspectors also during construction process
                                                                       •   assembling with internal final acceptance tests
                                                                          even before visit of EPC’s inspectors
                                                                       •   finishing and painting with several cycles, specific
                                                                          painting processes and special thickness
                                                                       •   shipment with suitable logistic means, also special
                                                                          cargo because almost packages reached 30 tons
                                                                          weight each.
                                                                       •   meeting delivery times at site

                                                                       SANCO has managed voluminous and complex
                                                                       projects but some have turned out to be more
                             Deluge valves on skid for Russia          remarkable than others.
                                                                       In particular, it is worth to mention three totally different
                                 cases with very extreme temperatures (-52°C   projects located respectively in Russia, Kazakhstan
                                 +65°C)                                and Kuwait.
                             •   improving the performances of the fire-fighting
                                 systems and equipment accordingly             SANCO has managed
                             •   granting the agreed delivery schedules and   sizeable and complex projects
                                 warranties, tailored to meet client’s construction   in very diverse environments,
                                 needs.                                      e.g. in Russia, Kazakhstan
                                                                                    and Kuwait

                             As a result, SANCO has been working and challenging
                             for:                                      The projects have been carried out throughout two
                             •   accurate selection among the end user’s   years by three different project task forces.

            IndustrIal Plants - May 2020