that proactive safety and environmental indicators   transporting the two 90-ton separators for the new
                (i.e. those leading toward continuous improvement   train all the way from Italy to Algeria to the gas field,
                of HSE performance) are tracked as a core metric.   which is deep in the Algerian Sahara, 1,200 km from
                                                      the Mediterranean. Workers had to carefully excavate
            •   Global and Local orientation. In addition to its   the ground where the new 200 train would be installed
                long global track record, Arkad has had significant   to make room for the new unit and prepare its
                experience in Algeria. The firm has worked in the   foundation without disturbing or stopping the operation
                country since 1970 and maintained an office in   of the 100 and 300 trains.
                Algiers since the early nineties. Past projects in
                Algeria included development of the El Merk oil   Keeping the material arriving at the right time and
                and gas field, a gas flaring elimination project at   planning for the arrival of the two 90 ton, 11-meter long
                Haoud Berkaoui, and the delivery of utilities,   separators required extensive planning. “We are not
                storage and export facilities for the central   talking about a site where you can reach the facility
                processing plant at Menzel Ledjmet East in the   easily,” recalls the Project Manager.
                Berkine Basin. Many of the 200 people who
                worked on the Rhourde Nouss project were local   The project’s peak workforce reached 200, a number
                employees of SARPI, a construction company   that could have easily overwhelmed the facility without
                jointly owned by both ABB and Sonatrach.  careful scheduling. To limit the chance of bottlenecks,
                                                      Arkad planners focused on simultaneous operations
                                                      (SimOps), and securing works permits early.
            The project                               Arkad’s emphasis on health, safety, and environment

            Construction began in November 2016.      also helped speed operations. Several Health, Safety,
                                                      and Environment teams trained workers on a
            Planners had to work around a variety of serious   continuous, ongoing basis and monitored the
            constraints. Located in the remote and almost   implementation of every HSE-related procedure.
            uninhabited  province  of  Ouargla,  1,200  km  from   Everyone from top management to subcontractors
            Algiers, the Rhourde Nouss gas fields are served by   were required to follow Arkad’s HSE system and KPIs.
            flights to the capital only twice a week. To make
            matters still more challenging, in April, May, September,   The HSE teams focused particularly on works at height
            and October, sandstorms can sometimes ground   and excavations, which are often particularly thorny
            flights and stop outdoor work for 3-5 days.  from an HSE perspective. Revamping a site like
                                                      Rhourde Nouss requires delicate maneuvers at height
            Most of the equipment and material had to come from   and a lot of excavation work by hand, to minimize the
            Italy, and coordinating its movement presented a   disturbance of systems underground, according to
            number of logistic challenges.  One of the biggest:   Arkad executives.