Page 39 - Industrial Plant 2020
P. 39

Picture 25





























                                                                                               Picture 26

                                         Picture 27   beams was less than the project bending moment of
                                                      the beam itself which, at the time of lifting, weighed
                                                      about 350 tons.
                                                      Due to the shape of the pile, before it was cut, it was
                                                      necessary to support it with the cranes, which
                                                      maintained, for the entire duration of the cut, a weight
                                                      close to 100% of its weight, so that the surfaces
                                                      affected by the cut were as discharged and neutral as
                                                      possible, avoiding  the release of  uncontrollable  and
                                                      sudden forces when the cut was completed. For the
                                                      removal of the pile column, the disassembly operation
                                                      took place using Fagioli CC2800 cranes, which took
                                                      load and lowered to the ground the pile blocks
                                                      previously cut with an electric Tyrolit SK B diamond
                                                      wire, a particularly compact wire suitable for being
                                                      used on aerial platforms. The sizing of these blocks
                                                      had  been  specifically  designed  to  be  easily  slung,
                                                      handled and processed once on the ground by means
                                                      of Fagioli SPMTs. (See picture 28)