Picture 28                                                      the operations were executed under a huge
                                                                          media pressure and with the constant control of
                                                                          National Authorities


                                                                       •   SAFETY - was the most demanding aspect,
                                                                          considering the poor conditions of the remaining
                                                                          bridge sections, the presence of asbestos on the
                                                                          bridge and on the buildings around, which were
                                                                          demolished.  Every  single  aspect of the  whole
                                                                          operation (168 uninterrupted days), was planned
                                                                          and detailed in  order to guarantee the  highest
                                                                          level of safety
                                                                                                                               Dust.
                                                                       •   ENGINEERING - Tower lift system, strand jacking
                                                                          systems, crawler cranes, SPMTs.. just to mention     NO , SO , HCl
                                                                          a few, were the technological advanced means               X       X
                                                                          used to execute the operation after hundreds of      Removal.
                                                                          engineering drawings and calculations.

                                                                       We are extremely proud to have been on board of this
                                                                       challenging project.                                    We do it all.
                             Final considerations                      Zero accidents!
                             Just thre e words to summarize the entire job:
                             •   URGENCY - to demolish the old bridge in order to
                                 prepare for the new one which is going to be built
                                 in  the  same  position  with  a  design  specifically   Special thanks to Loris Giovannini (Fagioli Engineering
                                 provided by the famous architect Renzo Piano. All   Director); F.LLI OMINI S.p.A.; IPE progetti s.r.l.; IREOS s.p.A.








                             Rudy Corbetta



                             Rudy Corbetta graduated at the faculty of Languages   Corbetta has been working for Fagioli as Publicity
                             and Foreign Literature  of the University of Bergamo.   Officer and Marketing Manager since 1999.
                             After several years spent as a financial broker, Rudy







                                                                                                                                                                                 We know flue gas treatment.
                                                                                                                                                     Dust removal
                                                                                                                               NO , SO , HCl, heavy metals reduction
                                                                                                                                  X
                                                                                                                                      X
                                                                                                                                              Flue gas conditioning              Our dust removal solutions can achieve practically zero
                                                                                                                                                                                                     3
                                                                                                                                                            Fans                 emissions: 0.1 mg/Nm  (0.06 gr/ft ). Our flue gas treatment
                                                                                                                                                                                                               3
                                                                                                                                                 Heat exchangers                 solutions remove: dust, acid gases, nitrogen oxides, sulfur
                                                                                                                                        Noise protection / silencers             oxides, mercury, furans, hydrochloric acid, dioxins and other
                                                                                                                                                        Dampers                  heavy metals. We offer everything needed to meet or surpass
                                                                                                                                    Handling, storage and structures             all air emission regulations worldwide.
                                                                                                                                 Installation, commissioning, training
                                                                                                                                                                                 www.boldrocchigroup.com





                                                                                                                                           Expect quality. Expect experience. Expect solutions.
            INDUSTRIAL PLANTS - May 2020
    38


                                                                                                                          Boldrocchi_DeNOx_Ad_Apr2020.indd   1                                                                    4/27/2020   6:19:07 AM
   35   36   37   38   39   40   41   42   43   44   45