Page 88 - Industrial Plant 2020
P. 88

Monsud S.p.A                                                •   a 300 collection tank (VASCA B-725) where
                                                                          meteoric  water convey for  disposal  to the
                                                                          purifier through a tank;
           Founded in 1979 by the idea of the engineer Mr. Domenico Pierni,   •   a  rolling  tank  (B-720)  equipped  with  a  flow
           born initially as a company of assembly and production of metal   regulator that allows the passage of the
           carpentry. As the years passed, with the acquisition of know-how   established flow.
           and increasingly innovative machinery, Monsud S.p.A. becomes a
           leading company in several and different sectors. Monsud S.p.A.
           owns three production plants located respectively in Avellino, Tufo and   The entire work has been developed in accordance
           Montemiletto, and operates as Main Contractor for the construction   with EN UNI 9001 and in compliance with the
           of civil, industrial, road, networks and transport, complex industrial   provisions on safety by the D.L. 494/96, D.L.
           facilities and infrastructure, power plants producing electricity,   528,99 and D.L. 81/08.
           plants for the exploitation of alternative energies (wind, photovoltaic,
           geothermal and incineration of RSU), special constructions and
           engineering services, plants for the glass and petrochemical industry.   At the end of this description it appeared clearly
           Monsud S.p.A. holds many certifications, such as EN ISO 9001, EN   that “Cornegliano Laudense Natural Gas” was a
           ISO 14001, EN 1090, EN ISO 50001, OHSAS 18001, SA 8000, SOA,   very innovative project, mirroring the idea that  “
           ASME VIII Part.I.
                                                                       storage is the future of the energy system”,  as
                                                                       stated by Mr. Bitetto, President of Ital Gas Storage.

                             also built secondary structures to serve the water   The fact that Monsud S.p.A. operates in such a
                             purification system of the storage plant, consisting   growing industry as the oil & gas field, taking
                             of separate systems for the collection of stratum   actively part in projects of this scope, is a clear sign
                             water, meteoric water, oil drainage and industrial   of an innovative and dynamic company, very
                             waste water.                              reliable  and  gifted  with  strong  personality  and
                             In relation to the purification system, Monsud   advanced technologies, with a constant look into
                             S.p.A. has provided:                      the future.








                             Domenico Pierni



                             Domenico Pierni is a Mechanical Engineer,   such as Saipem S.p.A., Dow Chemical S.p.A., Eni
                             graduated from the Università Federico II di Napoli.   S.p.A., Foster Wheeler, Sogin S.p.A., Enel S.p.A.,
                             He founded the Monsud company in 1979, of   Trenitalia S.p.A., CCR ISPRA, Telecom Italia,
                             which he is President and General Manager,   Vodafone, Jacobs, Fincantieri, Iter, Aeroporti di
                             consisting  of  about  90  employees.  With  his   Puglia,  Aeroporti  di Milano,  making  the  company
                             company he has worked for important customers   grow in numerous and important sectors.





                             Carmine Pierni


                             Carmine Pierni, lawyer and CEO of Monsud S.p.A.,   waste-to-energy plant on the Macomer site (NU),
                             has been managing various jobs for 15 years in   Executive planning and
                             various European countries: in France with   Erection works of Material Treatment Facility in
                             construction of a reinforced concrete building called   SOGIN Nuclear Power Plant in Latina; in Romania
                             TAPS (Tokamak Assembly preparation building)   with supply of steel structures for the Closed Blow
                             complete with mechanical and electrical systems,   Down System and POLYFUEL Project in Ploiesti for
                             for ITER; in Italy with Design and construction in a   Foster Wheeler








            IndustrIal Plants - May 2020
    86
   83   84   85   86   87   88   89   90   91   92   93